Ice Hockey Arena, CZE

I participated in the HMA project as a structural engineer at Artstat s.r.o. We were in charge of the construction part of the project from the study through the documentation for the zoning decision and construction procedure to the implementation project. Due to the complex shape of the building, it was a very challenging task - the mass of the stadium is formed by an oval inside and an ellipse outside. Monolithic (basements) and prefabricated reinforced concrete structures (above-ground part of the stadium and steel structures (roof, facade,…) are used in the building. The building is based on piles. Calculations were performed in Scia Engineer, FINE EC and GEO programs. The whole structure was modeled in Revit.

2.png

PROJECTS

Cardio center in Masaryk Hospital in Ústí nad Labem, CZE

These are three buildings standing in close proximity and directly adjacent to each other. The main building of the cardio center is seven-storey with one underground and 6 above-ground floors. It is a reinforced concrete monolithic skeleton with reinforcing cores. The ceiling slabs are designed as flat slabs with drop panels over the columns. The building is based on the base plate. I worked on the project for the company Artstat s.r.o. in the position of statics. I was in charge of all structural calculations and shape drawings and reinforcement diagrams. The project was processed in two stages Building permision stage and Detail design stage with an extremely short deadline for completion. Despite the difficult course, the project was completed on time and in the required quality.

Other bigger steel projects

Here are some of my steel projects I was working in the past:

Dedusting systems of Power plants and Steel works. 

Steel structures of industrial buildings. 

Steel melting complex. 

Bag filters.

Tall chimneys.

Silos.

Family Houses & other | IRL, CZE

I work closely with Charlotte Murphy, the owner of Charlotte Murphy Consutling based in Ireland on various family houses projects. I work on statics of all different parts that needed to be done.

Here are some other smaller projects I did work recently at Czech R. or abroad such as family houses, stairs, podiums, bridges etc.

I very much enjoy to work on these smaller projects as a supplement to my big projects. It takes just few weeks to finish them comparing year projects which is the feeling finishing something.